Ru En
Company News

PROSTOR Completes Comprehensive Engineering Systems Installation at the Yamal Arena Sports Complex

The construction of the sports complex in Salekhard is entering its final stage. PROSTOR has completed the full engineering fit‑out of both the main demonstration and the training ice arenas. 

The technological core of the project is built around equipment of the company’s own manufacture, including:

  • prefabricated upper structural ice‑field slabs with an integral pipe‑based cooling system;
  • design, production, and installation of the chiller plant;
  • manufacturing and installation of heat‑exchange 
  • water treatment systems.

In addition, both arenas have been equipped with professional‑grade hockey dasher boards, produced in‑house by PROSTOR and certified for top‑division matches, as well as three Zamboni 650 ice‑resurfacing machines. For the ice rinks, spectator areas, and the swimming pool, PROSTOR also designed, manufactured, and installed supply‑and‑exhaust air‑handling units with integrated cooling – again, all from its own production line.

A test hockey match has already been held at the arena, and the equipment demonstrated the highest quality standards.

The three‑storey multifunctional sports complex, with a total area of over 30,000 square metres, will house a main arena and a training rink (each 60×30 m), a universal games hall, a fitness centre, two swimming pools, and a dry‑training pool hall.

PROSTOR Completes Comprehensive Engineering Systems Installation at the Yamal Arena Sports Complex
PROSTOR Completes Comprehensive Engineering Systems Installation at the Yamal Arena Sports Complex
PROSTOR Completes Comprehensive Engineering Systems Installation at the Yamal Arena Sports Complex