Project works for the sections “Refrigeration,” “Construction of the technological ice field slab,” “Ventilation and dehumidification of the ice rink air” at the “RD” stage.
Delivery of the Sportchold-440 “Effektiv” refrigeration unit for the ice field, produced by “PROSTOR-L” (Russia), with a cooling capacity of 420 kW, with the following options:
Heat recovery for ground heating to prevent freezing;
Heat recovery for heating the snow-melting pit.
Heat recovery for preheating water in the water treatment system tank.
Heat recovery for additional water heating in the pool.
Supply and installation of an air handling unit with automatic temperature and humidity control, with an air flow of 10,000 m³, made by Mountair S2 12-25 (Swiss Confederation).
Installation of the upper concrete technological slab of the ice field with a piping system for cooling and ground heating to prevent freezing.
Supply and installation of drainage trays made of stainless steel around the perimeter of the ice field, produced by “PROSTOR-L” (Russia).
Supply and installation of a stainless steel fence for the snow-melting pit, produced by “PROSTOR-L” (Russia).
Supply and installation of the “Akvalyod” water treatment system, produced by “PROSTOR-L” (Russia), with a capacity of 1.5 m³.
Supply and installation of “SportArena” hockey boards, produced by “PROSTOR-L” (Russia), with complete boxes for players, penalty box and referees.
Supply of Zamboni ice resurfacing equipment (Canada).